Electrical Production in BC
The imported power is a mix of gas fired, coal fired and nuclear power. By not being able to even meet our own needs, we are increasing the demand for CO2 source electrical power. The power we had to import added 2.5 million tonnes in CO2 emissions in 2009, this does not count the need to run Burrard Thermal in the lower mainland.
The scope of scale of what we need in BC is larger than the Plutonic Energy Bute Inlet project, the biggest green project currently contemplated. The Bute Inlet project will only bring in 2900 GW/h per year. We are not only short, but we are falling further behind each year as our population grows.
Growth in demand will add the need for about 1500 GW/h per year. We need to build a Bute Inlet scale project every other year just to keep up with demand. If we want to get ahead of the the problem and become one of the major sources of a climate change solution we need to dramatically increase the speed at which more green power is brought online.
The opposition to green power production in BC does not seem to be related to any quantifiable environmental issues, it seems to be related to the fact that a Green Economy means businesses are going to be making money from saving the world. The opposition to green power in BC is harming the environment.
If I did not believe in conspiracy theories I would think that the opposition to green power in BC was some sort of funded campaign by the coal business. I find it crazy that the opposition to green power seems to be willing to ignore all the evidence in favour of environmental harm. The data is in, BC does not come close to producing enough power to meet our needs.
I continue to read all the websites and all the reports that relate to non storage hydro and I have to find anything that indicates a measurable environmental harm form non storage hydro. If anyone out there knows of a report that shows environmental damage, please send it to me.
Tuesday, February 9, 2010
Energy in the Throne Speech
The throne speech was read today and it highlights some energy issues.
I am encouraged by the clear support for more green power. I am also happy to see continued support for the Highway #37 powerline. The government is placing itself at the forefront of clean energy production in North America, this sets us up to gain a lot of jobs, reduce CO2 emissions and add to government revenues. All pluses.
I am looking forward to see the what comes out of the Green Energy Taskforce and what the new Clean Energy Act will look like. We are at the forefront of a paradigm shift here in BC with respect to energy.
Here is the section of the Throne Speech
Clean energy is this century's greenfield of opportunity.
British Columbia is blessed with enormous untapped energy potential.
We can harness that potential to generate new wealth and new jobs in our communities while we lower greenhouse gas emissions within and beyond our borders.
Clean energy is a cornerstone of our Climate Action Plan to reduce greenhouse gas emissions by one‑third by 2020.
Building on the contributions of the Green Energy Advisory Task Force, your government will launch a comprehensive strategy to put B.C. at the forefront of clean energy development.
We have enormous potential in bioenergy, run‑of‑river, wind, geothermal, tidal, wave and solar energy. We will put it to work for our economy.
A new Clean Energy Act will encourage new investments in independent power production while also strengthening BC Hydro.
It will provide for fair, predictable, clean power calls.
It will feature simplified procurement protocols and new measures to encourage investment and the jobs that flow with it.
New investment partnerships in infrastructure that encourage and enable clean modes of transportation, such as electric vehicles, hydrogen‑powered vehicles and vehicles powered by compressed natural gas and liquid natural gas, will be pursued.
We will support new jobs and private sector investment in wood pellet plants, cellulosic ethanol production, biomass gasification technologies and fuel cell technologies.
Bioenergy creates new uses for waste wood and beetle‑killed forests and new jobs for forest workers.
A new receiving license will give bioenergy producers new certainty of fiber supply, while a new stand‑as‑a‑whole pricing system will encourage utilization of logging residues and low‑grade material that was previously burned or left on the forest floor.
Government will optimize existing generation facilities and report on the Site C review this spring.
It will develop and capture B.C.'s unique capability to firm and shape the intermittent power supply that characterizes new sources of clean energy to deliver reliable, competitively‑priced, clean power — where and when it is needed most.
New conservation measures, smart meters and in‑home displays will help maximize energy savings. New smart grid investments and net metering will provide more choices and opportunities for reduced energy costs and more productive use of electricity.
New transmission investments will open up the Highway 37 corridor to new mines and clean power.
New transmission infrastructure will link Northeastern B.C. to our integrated grid, provide clean power to the energy industry and open up new capacity for clean power exports to Alberta, Saskatchewan and south of the border.
We will seek major transmission upgrades with utilities in California and elsewhere.
If we act with clear vision and concerted effort now, in 2030, people will look back to this decade as we look to the 1960s today.
Friday, January 29, 2010
Orinoco Oil Sands
At the moment there is about 600,000 barrels a day coming from this source and at a cost that is much lower than the cost of the Canadian tar sands. This about half of what is produced in Canada. I find that fact interesting because of the gap between Canadian per capita CO2 emissions and those in Venezuela. I think that the numbers for Venezuela are not correct because on a per capita basis the Canadian tar sands are only 55% larger than the Venezuelan oil sands.
The problem is that this oil source is in Venezuela and therefore under a government that is immune to local or global public opinion. Further complicating this will happen if the Chinese express an interest in getting oil from this source. Without a free press or a public that is allowed to speak out, it is very likely that we will see a huge environmental disaster happen in Venezuela as these oil sands are developed. Odds are we will not find out about this till long after it has happened.
Canada has serious first world environmental standards. Venezuela has the environmental standards of a dictatorship, which is to say there is nothing that will be enforced if they had anything on the books to start with.
Venezuela claims to have 35% protected areas, but these areas are logged and mined. Hugo Chavez should be the global poster child for environmental disaster.
Wednesday, January 27, 2010
Canada and the environment: A fresh start for a fresh decade by Preston Manning
This is quote from the piece:
Grounds for more productive dialogue and action on the environment do exist among those Canadians who share the following convictions: (1) That it is a good idea to reduce the negative environmental consequences associated with the production and burning of hydrocarbons, regardless of whether you consider global warming to be one of or the most serious of those consequences; and (2) That the choices required to address our environmental challenges are not polarizing and divisive “either/or” choices – either regulatory action by government or market based initiatives by business – but unifying and consensus-building “both/and” choices.
His seven points on routes on the way forward are a good reflection of the different options towards solutions, but he is correct to say no one route will be the answer and that all of them need to be embraced
- Full Cost Accounting
- Science, Technology, and Innovation
- Market mechanisms
- Government Policy and Regulation.
- Demand-Side Transformation.
- New Eco-Partnerships.
- Political Leadership at the National Level
Friday, January 22, 2010
Non-Storage Hydro aka Run of the River
Storage hydro facilities work on the idea that a large reservoir can store water for year round consistent power production on a large scale. The spring run off will take the reservoir to full pool and then the level is drawn down over the year as needed. The reservoir acts as a system to store the power until it is needed.
Non storage hydro has no capacity to retain water for later dates, it has no capacity to store power. This means that at the moment non storage hydro can not by the sole source of electrical power as the amount of power that can be generated varies during the year. When looked at in isolation, a specific project could have periods when it can not produce energy and therefore can not be considered firm supply on an ongoing basis. This all changes once there are a large number of sites throughout different parts of BC.
Non-Storage Hydro is the Internet of Electrical Production
The internet functions well not because any one part of this global network can carry all of the traffic all of the time, but because it is a system with thousands and millions of different nodes and routes and thereby allowing the internet to function well even if parts of it are down. This is the analogy one needs to think of when considering non storage hydro in BC. The overall generating capacity of non storage hydro in BC evens out as the number of generating sites operating increases. With more generating sites the electrical system can rely on more non storage hydro as firm capacity over the whole year.
BC has an abundance of locations on the coast for non storage hydro and the consistent year round rain fall to ensure year round generation in the vast majority of locations. Spring run off can occur from late March through to mid July in different areas of the province. Some people are concerned that non storage hydro sites can only provide power for part of the year. The data does not back this up.
Non Storage Hydro has very low CO2 Emissions
Non storage hydro has a very low carbon footprint, the lowest of any of the electrical production options available. The ongoing production of power from the facility has a very low CO2 output, mostly to do with the movement of people to and from the facility resources needed to maintain it. In some cases increased plant growth around the head pond may be enough to offset the ongoing CO2 contributions. The largest contribution of CO2 emissions comes from the construction of the facility.
The nature of the coast of BC and the needs of non storage hydro are well suited. Non storage hydro needs a decent year round water flow and steep inclines to provide a good head for the turbines. By their nature, the best sites for non storage hydro projects are in locations that are of lower values for wildlife and fish. In many cases, there are no fish near the project locations and the impact of the facility is not measurable downstream.
Energy Payback - Nothing is Better than Hydro
An important aspect of all energy production to be considered is the energy payback ratio – how much energy is generated for each unit of input energy. All hydro has a very high energy return rate, by far the best of any electrical generation. For a large scale storage hydro system the energy payback ratio is about 240 times as much energy is produced as was used to build and operate the facility. For non storage hydro this ratio is about 220 times. For fossil fuels it is only 1 to 7 times as much energy is produced as what is needed to build and operate. After hydro, the next best energy source is wind power at about 20 times the output when compared to the input. These numbers come from a July 2005 Hydro Quebec report by Luc Gagnon, there are other sources out there that confirm these numbers.
An energy payback of less than 1.5 means the system uses almost as much energy as it generates. Conventional coal fired power plants with CO2 capture and sequestration can be as low as this. This fact alone makes the idea that there will be a move to CO2 capture and storage by the coal fired power plants in North America unrealistic in the next 15 years.
BC has an Abundance of Sites
In 2007 there was a report by Kerr Wood Leidal on potential non storage hydro locations in BC. The report identified numerous ones with a combined annual generation of 50,000 GWh/yr. The report is a a useful ballpark to allow us to see what may be possible but it should not be taken as the final word on what is out there. The report missed out on many sites that are currently either in the planning stage or under development, the biggest example of this is the Plutonic Power Bute Inlet project.
The report was an overview of the province and made some assumptions that have not are not realistic, chief among them being that projects would not cluster and share infrastructure costs. The report was not able to make detailed and through design plans for each location and thereby missed many potential sites that are now under consideration.
As an example, Hawkeye Energy Corporation has identified and applied for 350 MW worth of sites for non storage hydro in less than one year. These sites have a potential for 1310 GW/h of generation. Many of their sites are located close to the Plutonic Power Bute Inlet project. As more projects are built and more infrastructure is there for them, the easier it is for smaller projects to piggy back on the infrastructure.
What we can take from the report and other sources is that BC has the capacity to develop more than 50,000 GWh/yr of non storage hydro over the next 15 years.
Non storage hydro has one more major advantage over almost all other green electrical generation technologies. Non storage hydro is economically viable now without any sort of market distorting government subsidies.
Tuesday, January 5, 2010
Our low electrical rates cause more CO2 emissions
Building more capacity is one way to reach electrical self sufficiency by 2016, but reducing demand would achieve this as well. Once we produce more electrical power than we consume we can export the excess green power to others in the west.
If BC were to charge higher rates for power, the public will be much more motivated to conserve power. Higher rates will also mean that more green energy sources will become economically viable without needed market distorting government subsidies.
The current price BC Hydro residential customers pay is $0.0591 per KWh for the first 1350 KWh in a two month period and then rising to $0.0827 for any power used over that amount. This is an average cost for a suburban home of about $0.065 a KWh. People in the BCFortis service area pay $0.07627 per KWh. These rates are the lowest any residential customers pay in the Western Interconnection.
BC should have a policy that the price of electricity in BC reflect rates in neighbouring markets. A mix of rates from Washington, Alberta, Idaho and Montana would make for a good basket
- Washington – $0.086
- Alberta – $0.089 average
- Idaho – $0.086
- Montana – $0.099
Average of the four = $0.09 per KWh
It is not unreasonable for BC to want to retain a competitive advantage, so reducing the cost by 10% of the average makes sense. Doing this gives us a price of $0.081 cents per KWh. This is still the cheapest power in the Western Interconnection but significantly higher than what we pay now. This higher price will quickly make conservation measures economical by making pay back times for the work less than three years.
The higher price should actually reduce demand for power in BC over a period of several years as people adjust to the higher price and change their habits to save money. We should see a leveling of total provincial demand for several years and then see a slower rate of increase than what has occurred in the last twenty years.
If we consume less power in BC there is more green power available for the rest of the Western Interconnection. By 2025, this should allow for BC to be using 10,000 to 15,000 GWh/yr less than it would without the price increase. That is enough power for between 750,000 and 1,250,000 people in California
Monday, January 4, 2010
The Carbon Tax should be a CO2 Emission Fee
The correct level to set a carbon tax at is one that reflects the cost of mechanical removal of CO2 from the atmosphere. Only mechanical removal makes any sense because it is can be empirically measured and verified. Many carbon offsets are for projects that would happen anyway or are in locations where it is impossible to verify compliance.
BC has the start of an agency that could capture and store CO2 - the Pacific Carbon Trust. With enough resources, the Pacific Carbon Trust could be a major player early on in co2 capture and storage.
What is the cost of capturing CO2? At this time it seems that the cost is about $65 per tonne to capture and store CO2. This price would indicate that BC should be aiming for a carbon tax of about $70 per tonne to ensure enough taxes are recovered to pay for capture and storage of all the CO2 emitted by fuels in BC. This would mean a carbon tax of close to 17 cents a litre on gasoline.
17 cents a litre is a significant rise from where the tax is now, but adding two more years of phase in to the carbon tax BC could be at 17 cents a litre by 2014. This level of fee could fall over time as the price to capture and store carbon falls. As an industry develops and innovates, it is realistic to expect the price to capture and store CO2 falling to $40 per tonne by 2025.
Linking the fee to the amount of CO2 emissions means the government could set up an opt out system for companies or people that capture and store their own CO2. The Pacific Carbon Trust would monitor the opt outs. Allowing the opt out will encourage even more innovation in CO2 capture and storage and bring down the costs faster.